This is a migrated thread and some comments may be shown as answers.

Suggestion: Overall success status for an iteration based test run

1 Answer 68 Views
General Discussions
This is a migrated thread and some comments may be shown as answers.
Adam
Top achievements
Rank 1
Adam asked on 06 Mar 2013, 10:59 PM
Hi,

I'm in the test steps editor and I have configured a set of test steps to be executed against a data source. When I run the test, it runs all test steps for each row in the data source.

At the end of the test run I see above the steps an indicator that the first iteration passed (see attachment for screenshot).

However what I cannot tell at a glance is that iteration 2 may have failed.

What I think would be a good idea is to show an overall pass/fail indicator for the entire run (which should be more prominent), along with pass/fail indicators per iteration (as per now).

Cheers, Adam.


1 Answer, 1 is accepted

Sort by
0
Boyan Boev
Telerik team
answered on 11 Mar 2013, 03:37 PM
Hi Adam,

I have created a feature request for this feature, which you can follow in our public portal.

Thanks for your input, which we rely upon to improve our product.
 

All the best,
Boyan Boev
the Telerik team
Quickly become an expert in Test Studio, check out our new training sessions!
Test Studio Trainings
Tags
General Discussions
Asked by
Adam
Top achievements
Rank 1
Answers by
Boyan Boev
Telerik team
Share this question
or