php-banner

Telerik UI for JSP

What's New

What's New History

Archived release. This page is no longer updated. Check the Latest Release

New Component: Wizard

The Telerik UI for JSP Wizard component is makes completing long forms easy to the end user. Use it when you want to present users with small, manageable chunks of information they need to process before moving to the next one. The Wizard has built-in validation at each step of the way and as flexible as it gets – content can be a Form component or some other random HTML.

New Component: Pager

The recently added Telerik UI for JSP Pager component extends others controls to provide pagination. It adds all the necessary UI elements to move between different pages of the same content for controls with long lists of data like the ListView.

New Component: Image Editor

Let your users edit image files directly in their browser without plugins and without switching to another program. With the ability to resize, crop zoom and download the resulting image, the Image Editor component will serve you in every app with image management.

Image Editor

New Component: AppBar

The newly added Telerik UI for JSP AppBar is a container designed to work as either a header or footer in your app. Items in it are split into sections to better model how they would be used in the real world. However, the AppBar is more than a navigation menu - thanks to support for templates, it can be built to best reflect your requirements however complex they might be.

AppBar

New Component: Loader

Indicate that a background process is in progress with the Telerik UI for JSP Loader component. Choose among one of the several animation styles, shapes and colors to produce a Loader specific for your project.

Loader Infinite Spinner

New Component: Text Area

Use the newly-released Telerik UI for JSP TextArea component when you ask your users for text input of average length – when a standard TextBox would be too short and a full-fledged editor would be an overkill.

TextArea

New Grid Feature: Sticky Columns

In R3 2020, we added Sticky Columns to the Telerik UI for JSP Grid control which is another way to mark important columns. Columns marked as sticky will always be visible on the screen, regardless of where the use has already scrolled. This is of key importance to Grids with many columns.

Grid Features - Sticky Column

New Spreadsheet Feature: Cells with Custom HTML

Display custom HTML in your Spreadsheet cells to present data in a way that makes the most sense to your users – whether you need to present an image or some custom control.

Spreadsheet feature Render cells using custom HTML

New Gantt Feature: Column Options

The Telerik UI for JSP Gantt control has been enhanced to offer a variety of options for each column like sorting, filtering and etc. See the full list of new options in our component page.

Gantt Sorting a column

New Gantt Feature: Column Templates

You can now control how columns are rendered – place any content in them, not just plain text. Images, links, multi-line descriptions and anything you possibly need.

Gantt Column Templates

New Gantt Component Feature: Planned Vs. Actual

Let users check how well their plan is progressing with the newly added Planned Vs. Actual summary. Visual indicators will display if and by how much the actual time spent deviates from the planned, expected delivery time.

Gantt

New TreeList Feature: Drag & Drop to Reorder

With R3 2020, you can now reorder TreeList nodes on the same level by simply drag-and-dropping the wanted items where appropriate. The old drag and drop behavior of nesting nodes into one another is still present and the two can work in conjunction.

TreeList Drag & Drop

New TreeList Feature: Checkbox Selection

Another feature we added to the TextBox is the ability to mark a column with the Selectable property. When enabled, every row in the TreeList can be selected through a CheckBox which is auto-inserted at in the marked column. You can further control if selection works only to the current row or to all of descendants.

TreeList Checkbox Selection

Previous Product Releases

Detailed Release Notes List for past 15 years

See History
Get Started Section Waves Banner

Next Steps

Download 30-day Free Trial

Try Telerik UI for JSP with dedicated technical support.

Launch Demos

See the UI for JSP in action and check how much it can do out-of-the-box.

Compare Prices

Check out the offers. Purchase an individual suite or treat yourself to one of our bundles.